Documents and reports

NGT documents, papers and reports to download.

March 2012 (Programme Entry Business Case Submission)

This document sets out the Promoters Programme Entry Business Case Submission Bid to the Department for Transport (DfT).

Programme Entry Business Case Submission full document (pdf, 1.42mb)

The Appendices are split into smaller PDF files, for ease of viewing. There are a couple of larger files, which may take a little longer to download.

Appendices supporting the Programme Entry Business Case Submission

September 2011 (Best and Final Funding Bid)

This document sets out the Promoters Best and Final Funding Bid to the Department for Transport (DfT).

Best and Final Funding Bid full document (pdf, 745k)

The Appendices are split into smaller PDF files, for ease of viewing. There are a couple of larger files, which may take a little longer to download.

Appendices supporting the Best and Final Funding Bid

May to June 2010 (Public Consultation)

A four week consultation period, on the proposal to extend the New Generation Transport scheme to Holt Park, ran from 20 May until 18 June 2010 and included a public exhibition at Holt Park. A copy of the consultation leaflet, questionnaire and results can be downloaded individually.

October 2009 (Major Scheme Business Case)

This document forms the Major Scheme Business Case submission to the Department for Transport (DfT) seeking Programme Entry for the Leeds New Generation Transport network. The document is also broken into sections, which can be downloaded individually.

Major Scheme Business Case - Full document (pdf, 1936k)

The MSBC is supported by 58 appendices.

June to September 2009 (Public Consultation)

A twelve week consultation period, on the New Generation Transport scheme, ran from 15 June until 4 September 2009 and included six public exhibitions, which were held on each on the proposed routes and in Leeds City Centre. A copy of the consultation leaflet, questionnaire and results can be downloaded individually.

April 2009 (Investing in Public Transport: A Framework for Leeds)

A summary of a technical report analysing how NGT fits within the wider public transport context.

November 2008 to January 2009 (Public Consultation)

An eight week public consultation period, on the New Generation Transport scheme, ran from 12 November 2008 until 9 January 2009 and included a public exhibition in Leeds City Centre. A copy of the consultation leaflet, questionnaire and results can be downloaded individually.